Introduction

Since our establishment in 1972, we have been engaged mainly in the business of interior and exterior metal panel construction drawings for many years.

Using the technology and experience we have built up, our employees are working together to deliver good construction drawings to many customers even faster.

Since our overseas expansion, we are constantly evolving to be able to handle even more construction drawings.

If you are having trouble with construction drawings, please consider our company and we will do our best to help you.

What is a Building Hardware Construction Plan?

A construction plan is a drawing required to make and install hardware in a building.

There are three main types of drawings for building construction: a basic drawing required for registration, an execution drawing required before estimates and construction, and a construction drawing required during construction.

The construction drawing we draw is required at the construction stage.

This construction drawing will be seen by various people involved in the work at the site, so we must always try to make it easy to read.

Construction drawings for building hardware are one of the key technologies that enable Japan's excellent construction technology.

Master Agreement for Preparation of Design Drawings

Actual construction drawings list

・Tohoku Shinkansen Line: New construction of Hachinohe Station_Shed 





 Exterior wall panel

・Tohoku Shinkansen Line: New construction of Hachinohe Station_East-West free passage 





 Exterior wall panel

・Construction of Kamimizo Station on the JR Sagami Line 





 Exterior wall panel

・Ikebukuro Line between Sakuradai Station and the vicinity of Nerima Station Continuous grade separation work 





 Exterior wall panel

・Construction of Yashio Station on the JR Joban Line 





 Exterior Wall Panel

・Todoroki Athletic Stadium Main Stand Renovation 1st Floor 





 Handrail

・Upper-Level Utilization Project for Rebuilding Shibaura Water Reclamation Center 





 ladder

・Minami-ikebukuro 2-A Area Type 1 Urban Area Redevelopment Project Facility Construction 11th Floor 





 Louver

・Kumamoto Station Building New Construction and Other Works 





 Spandrel

・Renovation of elevators on the east side of Tachihi Station and other works 





 East side maintenance pipe

・Renovation and seismic retrofitting of Harumi Grand Hotel Second Floor Windshield Room (2)  





 Ceiling Aluminum Cut Panel

・ Yokohama Cultural Gymnasium Renovation Project Private Profit-Making Facility Project New Construction 





 SUS ceiling panel

・New National Stadium Construction  C-14-4, C-16-4 (South Pedet Stairway 18) 





 Handrail intrusion prevention fence

・Meiji Hachioji New Research Center New Construction 





 Drain around the roof penetrations housing

  • Improvement of Shin-Urayasu Station Main Building, Station Office, etc
  • Improvement of pedestrian road No. 8 at the west exit of Kawasaki Station and other works
  • Hamamatsucho Station monorail connection facilities flattened, etc
  • Continuum Overpass Construction between Daita Station and Kitami Station in Setagaya Ward
  • Morioka Station West Exit Line 2 Artificial Ground Lifting Facility Installation and Other Construction
  • New Kotsu Rinkai Line Toyosu Station Construction
  • Tohoku Line Nogi Station Passage
  • Renovation of Tokorozawa Civic Gymnasium
  • Construction of Takara Standard Shizuoka Branch
  • Urawa Higashi Police Station Building Construction
  • Toho University Medical Center Omori Hospital Renovation
  • Construction of an extension to the main building of Denshi Gakuen
  • Tokyo Sankyo Shinkin Bank Chofu Branch New Construction
  • New construction of a designated facility building (A3 building) in the west exit of Chiba Station
  • Keikyu Kamata Nishiguchi Station Area Type 1 Urban Area Redevelopment Project New Building Construction
  • Hokuriku Shinkansen Toyama Station Construction
  • Hokuriku Shinkansen New Takaoka Station Construction
  • Chiba Station improvement, station building reconstruction, etc.
  • Reconstruction of the Embassy of the Republic of Indonesia in Tokyo
  • Tamagawa-Josui Station free passage renovation construction and other works
  • Reconstruction of Asahikawa General Office Building
  • Yokohama Minatomirai Hall renovation work
  • SS Columbia Exterior Iron Section Renovation and Other Works
  • Construction of groundwater management facilities in Toyosu New Market's 7-block district
  • New Construction of Naha Airport Office Control Tower
  • Reconstruction of NHK Broadcasting Center
  • Tokyo International Airport Terminal 2 International Facility Construction
  • New Construction of KDDI Corporation Tama Center Building
  • Construction of facilities and other buildings associated with the Ginza 6- 10 District Type 1 Urban Area Redevelopment Project
  • Urayasu City New Government Building Construction
  • Shin-Kotsu Rinkai Line Extension Section Toyosu Station Construction
  • Construction of Shin-Kotsu Rinkai Line Extension Section Ariake Kita Station
  • Kasukabe Station West Exit Building New Construction
  • Nagoya Building East Building
  • New Construction of Ohara Gakuen Tachikawa Campus
  • New Construction of Ohara Japanese Language Institute

Annual number of cases (FY 2023): Approx. 3,500 cases Approx. 28,000 sheets
Number of customers: Over 200 companies

We draw construction drawings that meet your needs.

In this day and age where human resources tend to be in short supply, please consider us if you have trouble drawing construction drawings.

Our abundant human resources enable us to respond quickly to deadlines.

In addition, our company draws construction drawings, so we can handle large-scale construction work that cannot be handled by an individual.

Are you ordering a large number of items from various places, making management complicated?

If you entrust us with drawing multiple items, we will draw construction drawings that are competitive with other companies.

By making the latest drawings into QR codes, we can read them on a smartphone or tablet device when checking on site, so we can exchange checks without printing them on paper.

We hope to contribute to the SDGs as part of our environment-friendly efforts, so if you are a company that agrees with us, please contact our sales department.

We draw construction drawings that meet your needs.

In this day and age where human resources tend to be in short supply, please consider us if you have trouble drawing construction drawings.

Our abundant human resources enable us to respond quickly to deadlines.

In addition, our company draws construction drawings, so we can handle large-scale construction work that cannot be handled by an individual.

Are you ordering a large number of items from various places, making management complicated?

If you entrust us with drawing multiple items, we will draw construction drawings that are competitive with other companies.

By making the latest drawings into QR codes, we can read them on a smartphone or tablet device when checking on site, so we can exchange checks without printing them on paper.

We hope to contribute to the SDGs as part of our environment-friendly efforts, so if you are a company that agrees with us, please contact our sales department.